by dervin@lcwconstruction.com | May 26, 2022
Construction of a new 8,500SF sheriff’s office substation and complete site development package. Work includes concrete foundations, bullet resistant masonry walls and glazing, light gauge metal trusses, holding area with detention hardware and fixtures, security and...
by dervin@lcwconstruction.com | May 26, 2022
Replace 1400 LF of street to include new storm sewer, new water main and branch lines, new lighting, new curb and gutter and sidewalks, and new asphalt paving.
by dervin@lcwconstruction.com | May 26, 2022
Demolition and replacement of the existing Main Street frontage in downtown Strasburg. The work includes new sidewalks, brick pavers, asphalt paving, street lighting and landscaping.
by dervin@lcwconstruction.com | May 26, 2022
Site development and construction of a new 21,500 square foot pre-engineered steel and masonry structure. The exterior finishes include brick veneer, metal wall panels and standing seam roofing.
by dervin@lcwconstruction.com | May 26, 2022
Renovation, addition, and upgrade to an existing wastewater treatment plant. Construction includes a 2,660 SF addition to the existing building and underground concrete tanks.